An industrial project rooted in Moungo
The initiative led by Patrice Samen, promoter of SAMEN INDUSTRY S.A. and mayor of Nkongsamba 2nd, is designed to bring cocoa collection, storage and processing closer together within the Moungo production area. In Baré-Bakem, the company is building a plant intended to manufacture cocoa-derived products, including liquor or mass, butter, powder and cake.

The development covers a 3-hectare site, with approximately 1.4 hectares allocated to the main building. Its grinding line is designed for about 4 tonnes per hour, equivalent to approximately 32,000 tonnes of beans annually. The estimated investment ranges from XAF 20 billion to XAF 30 billion, while 300 to 500 direct jobs are expected.
The foundation stone was laid on 27 February 2026 in the presence of Trade Minister Luc Magloire Mbarga Atangana and Agriculture Minister Gabriel Mbairobe. Cameroonian media have covered the facility as part of the expansion of cocoa processing activities in Baré-Bakem.3,4
Connecting bean collection with processing
A post reporting on a working visit by the managing director of BGFIBank Cameroon describes two linked facilities: a cocoa-bean storage site and the construction site of the future processing plant. According to that account, the storage expansion is intended to support bean intake and improve the security of industrial supply.2
This connection between collection, preservation and grinding is particularly relevant to buyers and industrial partners. Supply consistency, origin identification, storage controls and lot management can affect production continuity as well as the quality of the resulting cocoa ingredients.

A second post presents BGFIBank Cameroon’s involvement as support for the collection and processing project, which targets annual capacity of approximately 32,000 tonnes. These reports reinforce the project’s industrial positioning, but they do not independently establish that the facility was operational on the date of this article.2
Verified information and points requiring confirmation
Confirmed factsVerified company information covers the Baré-Bakem location, the grinding line’s nominal capacity, the planned product range, the estimated investment and expected direct employment. The project is positioned within Cameroon’s SND30 and import-substitution framework, with the aim of retaining more cocoa value addition inside the country.
Commissioning had initially been announced for before July 2026. A later social-media post states that the plant equipment had been manufactured and preassembled in China, with shipment and installation in Cameroon planned before the end of the year. However, the supplied sources include no acceptance report, formal start-up notice or production record. The plant’s current operational status must therefore be confirmed directly with SAMEN INDUSTRY.2
Prospective partners should also verify the progress of storage expansion, the equipment delivery and installation timetable, the effective start of the grinding line and the volumes available for commercial supply. Such verification is important before entering procurement, financing or technical-support arrangements.
Documentary priorities for buyers and partners
Preparatory discussions can address bean specifications, quality criteria, segregation of lots, supplier records, transport documentation, storage conditions and the technical characteristics expected for cocoa mass, butter, powder and cake.
For markets subject to traceability requirements, SAMEN INDUSTRY can also structure documentary readiness around supplier identification, lot origins, inventory movements and retention of supporting records. This is a preparation process only. It does not justify describing SAMEN INDUSTRY, any supplier or any cocoa lot as compliant with the European Union Deforestation Regulation.
From an institutional perspective, the opportunity for Nkongsamba and Moungo is to connect the area’s agricultural base with verifiable local industrial capacity. For buyers, banks, equipment suppliers and technical partners, the practical next step is to request current documentation on commissioning, quality procedures, traceability systems and the commercial availability of each cocoa product.
Video
On Facebook
Sources
- 1.news.google.com (opens in a new window)news.google.com/rss/search?q=%22Patrice+Samen%22&hl=fr&gl=FR…
- 2.Facebook Patrice Samen #1 (opens in a new window)facebook.com/61584455391668/posts/122146029951148513
- 3.EcoMatin
- 4.Cameroon-Tribune




